For Cine Colombia Bellavista in the city of Barranquilla, Colombia, a critical situation arose when a chiller weighing approximately 15 tons began to fail and eventually stopped operating. The challenge for this project was to, through proper logistics, replace two chillers in less than four days. The proposed objectives were achieved in a timeframe shorter than typically required to address a contingency of this magnitude.