INDUSTRIAL
ENEL TENJO AIR SYSTEM.
We excel in our expertise with precision air conditioning systems, as demonstrated in the AMAZON project. In this case, our engineering team advised the client when faced with a challenge: the initial equipment selected by a design firm did not meet the manufacturer’s specifications. We identified and selected an alternative precision technology, safeguarding the warranty and optimizing the system’s performance.
CHILLER REPLACEMENT
For Cine Colombia Bellavista in the city of Barranquilla, Colombia, a critical situation arose when a chiller weighing approximately 15 tons began to fail and eventually stopped operating. The challenge for this project was to, through proper logistics, replace two chillers in less than four days. The proposed objectives were achieved in a timeframe shorter than typically required to address a contingency of this magnitude.
PRECISION EQUIPMENT INSTALLATION
We carried out the installation of an extraction system for particle collection in the process of polishing and repairing drill bits for oil drilling.
CHILLERS DESIGN
Due to the implementation of a new industrial process at Casa Luker, it was necessary to design a 3D chilled water system for its pumping systems and chillers, according to the client’s needs and specifications.